In a Step Reflecting the Accelerated construction of the Oman–UAE Railway Network Hafeet Rail Receives First Shipment of Railway Tracks at SOHAR Port
In a step that reflects the accelerated construction of the Oman–UAE Railway Network, Hafeet Rail -the developer and operator of the project- received the first shipment of railway tracks through the General Cargo Terminal at SOHAR Port and Freezone, which is operated by C. Steinweg Oman LLC. This milestone represents a significant moment in the execution of the project, which links the Sultanate of Oman with the United Arab Emirates and paves the way for the next phase of on-ground construction.
The shipment comprises more than 3,800 pieces of (E260) railway tracks, each measuring 25 meters in length, with a total weight of 5,700 metric tons. Manufactured in accordance with the highest international standards for rail transport at ArcelorMittal’s facility in Gijón, Spain, this delivery forms part of a total planned supply of 33,100 metric tons.
The railway tracks are engineered to withstand heavy freight, and passenger loads of up to 32.4 tonnes per axle, ensuring high performance and long-term reliability tailored to the geographical and environmental conditions of the project. Each rail has undergone rigorous precision manufacturing to guarantee structural integrity and is reinforced with advanced fastening systems using high-strength clips and bolts, providing stability and durability under the demanding operational conditions of both freight and passenger trains.
The arrival of this shipment paves the way for the next phase of the project, which includes track-laying works along the route, in parallel with preparations to receive additional shipments in the coming months. These efforts will support advanced stages of construction and reinforce steady progress in line with the planned timeline of the project.
This milestone marks a significant step in the implementation of the Oman–UAE Railway Network, which extends 238 kilometers to connect the SOHAR Port with the UAE’s national railway network. The project will enhance supply chain integration, improve the efficiency of the transport ecosystem, and support economic cooperation and sustainable development between the two nations.
Developed and operated by Hafeet Rail, the project is the outcome of a strategic partnership between Asyad Group, Etihad Rail, and Mubadala. It represents a cornerstone in strengthening regional economic integration, advancing a sustainable transport infrastructure, and providing advanced logistics capabilities that facilitate cross-border trade and stimulate local markets in both countries.Other news
Asyad Group Advances Smarter, More Sustainable Logistics and Maritime Solutions through Three New Agreements
Strategic partnerships in autonomous vehicles, green hydrogen and onshore power supply drive innovation across transport and maritime operations, marking a new step towards a low-carbon mobility future in Oman
Read moreASYAD Container Terminal, Duqm Welcomes CMA CGM VASCO DE GAMA, Reinforcing Its Capability to Handle Ultra-Large Container Vessels with a capacity of around 18,000 TEUs
Duqm– 20 July 2026: Asyad Container Terminal – Duqm (ACT) welcomed the arrival of the M/V CMA CGM VASCO DE GAMA, marking the vessel's inaugural call at the terminal and establishing a new milestone as the largest container vessel ever to berth at ACT.
Read moreAsyad Group and CMA CGM Group Initiate Strategic Partnership to Enhance Maritime Connectivity and New Regional Trade Corridors Through a Multipurpose Logistics Terminal in Oman
Asyad Group, Oman’s global integrated logistics provider, and CMA CGM Group, a global player in sea, land, air and logistics solutions, headquartered in France, have signed a Framework Agreement to develop, manage, and operate a multipurpose logistics terminal in Sohar.
Read more